200kVA Event Hybrid Power Solution
Solution Information
Below is an example of how you can use multiple battery battery systems powered from one large central 200kVA generator. In this example we are using the generator to power the main stage and the bar during the event hours 11am - Midnight. Outside of these hours the battery seamlessly takes over delivering a 45.8% reduction in generator runtime whilst maintaining a reliable, small, silent, emission free power feed to the fridges, amplifiers, lighting control systems etc.
The battery system is not powerful enough to run the whole bar and/or main stage during full operation, this is why we run the generator during these times. The battery is designed to maintain power to all the essential circuits outside of the event hours avoiding fridges warming up and sensitive electrical equipment building up condensation or requiring re-calibration.
An important issue to consider for these applications is the logistic challenges of getting equipment to and from the event.
System Benefits
The real benefits of the Green Power Hire system based on a 14 day periodFuel consumption reduced by
3659.0L
Total CO2e emissions cut by
11.55T
Total percentage of silent hours
45.8%
System Comparison
How our system compares against the rest based on a 14 day periodHybrid Power System
- Fuel consumption - 6552.0L
- Silent run hours - 154 hours
- C02e emissions - 20.68 T
- Generator run hours - 182 hours
Diesel Generator
- Fuel consumption - 10211L
- Silent run hours -0
- C02e emissions - 32.23T
- Generator run hours - 336 hours